Commissioning Checklist for Refineries

Commissioning is a critical phase in the lifecycle of a refinery project, ensuring all systems and equipment are fully functional, safe, and ready for continuous operation. A structured and well-documented commissioning process minimizes start-up risks, enhances plant reliability, and ensures compliance with industry standards. This comprehensive checklist outlines the key steps and verifications required during pre-commissioning, commissioning, and start-up phases—serving as an essential guide for refinery engineers, operators, and project managers.

1. Pre-Commissioning Checklist (Static Checks)

AreaActivity
DocumentationAll design documents, P&IDs, loop diagrams, vendor manuals reviewed
Mechanical CompletionAll piping, equipment, valves, nozzles installed and aligned
Welding & NDTWeld joints inspected as per code (e.g., ASME B31.3)
HydrotestingPressure testing of pipelines and vessels completed
Electrical ChecksContinuity, insulation resistance, earthing, and breaker tests done
InstrumentationLoop checks, instrument calibration (ISA 5.1 symbols compliance)
Flushing & CleaningOil flushing, air blowing, chemical cleaning of process lines
Drying & InertingLines purged and dried using nitrogen or air
Paint & InsulationFinal coat applied; insulation and cladding checked

2. Commissioning Checklist (Dynamic Checks)

SystemActivity
UtilitiesAir, water, nitrogen, steam, and power systems tested under load
Control SystemsDCS, SCADA, PLC programs simulated and verified
Motor RunsNo-load motor rotation check, vibration testing, alignment
Rotating EquipmentCompressors, turbines, pumps tested with lubrication & cooling
Safety SystemsESD, fire & gas systems, alarms, emergency shutdown verified
Valve Stroke TestAll MOVs, AOVs, PSV blow-off and stroking checked
CommunicationRadios, PA systems, SCADA–field device integration tested
Line-up ChecksAll valves and instruments verified against P&ID for line-up
Pre-Start-Up Safety Review (PSSR)Safety, process, and operational readiness reviewed

3. Start-Up Readiness Checklist

AreaTask
Permit to OperateAll statutory approvals and permits secured
Handover CertificationMC handover from EPC to O&M team completed
SOP AvailabilityStandard Operating Procedures documented and approved
TrainingOperators trained on procedures and emergency scenarios
Startup PlanStep-by-step startup plan and contingency plans in place
Chemicals & InventoryChemicals loaded, feedstock available, utilities stabilized
Log BookControl room logs initialized and system checklists updated

Recommended Documentation

  • P&ID Mark-up and Redline Drawings
  • Equipment Data Sheets and Calibration Reports
  • Inspection Test Plans (ITPs)
  • Safety Integrity Level (SIL) Reports
  • Loop Folder for Instrumentation
  • Pre-Startup Safety Review Report
  • Commissioning Dossiers and Punch List Status

Conclusion

A successful refinery commissioning process is vital to achieving long-term operational safety, efficiency, and reliability. By following a detailed checklist covering pre-commissioning, dynamic testing, and start-up readiness, project teams can minimize delays, avoid costly rework, and ensure a smooth transition to full-scale operations. At EngiMates Resources and Energy Pvt Ltd, we bring deep industry expertise and proven methodologies to support safe, compliant, and performance-driven refinery commissioning. Trust us to deliver technical excellence—right from the drawing board to the first barrel.